South Humber Bank Energy Centre Project
This Application has now been accepted by the Planning Inspectorate. Any representation (giving notice of any interest in or objection to the Application) must be made on the Planning Inspectorate Registration and Relevant Representation Form by 16 July 2020. The form is available on the Planning Inspectorate website at: https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/south-humber-bank-energy-centre.
Key Figures
About the Project
The EfW power station will be known as South Humber Bank Energy Centre (SHBEC). EPUKI acquired the SHBPS site from Centrica in 2017. The SHBPS site includes a combined cycle gas turbine (CCGT) power station with a gross electrical output of around 1,400 MW, a cooling water pumping station and areas of undeveloped land.
Energy from Waste
SHBEC will be built on undeveloped land within the boundary of the SHBPS site to the east of the CCGT power station.
Investment
It represents a significant investment by EPWM in North East Lincolnshire (approximately £300 million) and follows a recent major investment by EPUKI in the existing CCGT power station to extend its operational life.
EPUKI Operations
EPUKI owns and operates a number of other power stations in the UK, including Langage Power Station near Plymouth and Lynemouth Power Station in Northumberland.
Project Information
Learn more about the South Humber Bank Energy Centre Project, its background and the ongoing application process.
Project Details
EP Waste Management Ltd (EPWM), a subsidiary of EP UK Investments Ltd (EPUKI), is seeking development consent for the construction, operation and maintenance of an energy from waste ('EfW') power station with a gross electrical output of up to 95 megawatts (MW) at the Site.
Planning Permission
Full planning permission was granted by North East Lincolnshire Council (NELC) on 12th April 2019 for the construction of an EfW power station at the Site with a gross electrical output of up to 49.9 MW.
Development Consent Order Application
The application for development consent was submitted on 9 April 2020 and is currently being checked by the Planning Inspectorate.