Shbenergycentre
EPWM Limited

South Humber Bank Energy Centre Project

This Application has now been accepted by the Planning Inspectorate. Any representation (giving notice of any interest in or objection to the Application) must be made on the Planning Inspectorate Registration and Relevant Representation Form by 16 July 2020. The form is available on the Planning Inspectorate website at: https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/south-humber-bank-energy-centre.

Key Figures

95 MW
Gross Electrical Output
£300M
Investment
600+
Construction Jobs
30 yrs
Operating Life
Background

About the Project

The EfW power station will be known as South Humber Bank Energy Centre (SHBEC). EPUKI acquired the SHBPS site from Centrica in 2017. The SHBPS site includes a combined cycle gas turbine (CCGT) power station with a gross electrical output of around 1,400 MW, a cooling water pumping station and areas of undeveloped land.

⚡

Energy from Waste

SHBEC will be built on undeveloped land within the boundary of the SHBPS site to the east of the CCGT power station.

🏭

Investment

It represents a significant investment by EPWM in North East Lincolnshire (approximately £300 million) and follows a recent major investment by EPUKI in the existing CCGT power station to extend its operational life.

👷

EPUKI Operations

EPUKI owns and operates a number of other power stations in the UK, including Langage Power Station near Plymouth and Lynemouth Power Station in Northumberland.

Other reading

Keep up to date

This website will be updated as the SHBEC Project progresses. Please visit again soon to find out more.